LIFTBOT case study
with Chevron

LIFTBOT case study with Chevron

LIFTBOT case study with Chevron

3 LIFTBOTs were deployed during a pre-turnaround to support scaffold erection/dismantle and mechanical work.

3 LIFTBOTs were deployed during a pre-turnaround to support scaffold erection/dismantle and mechanical work.

LIFTBOT saved $988K
on a 3 months pre-turnaround

LIFTBOT saved $565K
on 3 months
pre-turnaround

LIFTBOT saved $988K
on a 3 months pre-turnaround

$0

$0

Total savings

including labour cost and crane rent, operator, rigger, and fuel cost.

$0

$0

Total savings

including labour cost and crane rent, operator, rigger, and fuel cost.

$0

$0

Total savings

including labour cost and crane rent, operator, rigger, and fuel cost.

0hrs

0hrs

Hazardous man-hours reduction

excluded from the line of fire.

0hrs

0hrs

Hazardous man-hours reduction

excluded from the line of fire.

0hrs

0hrs

Hazardous man-hours reduction

excluded from the line of fire.

Vertical material transport

Crane

Crane

Crane

Crane

For two flares

Total crane rent and labor cost

$443,540

Total crane rent and labor cost

$443,540

Total crane rent and labor cost

$443,540

Man-hours

3,117 hrs

Man-hours

3,117 hrs

Man-hours

3,117 hrs

For furnace and column

Total crane rent and labor cost

$554,700

Total crane rent and labor cost

$554,700

Total crane rent and labor cost

$554,700

Man-hours

4,650 hrs

Man-hours

4,650 hrs

Man-hours

4,650 hrs

Vertical material transport

LIFTBOT

LIFTBOT

LIFTBOT

LIFTBOT

For two flares

Total crane rent and labor cost

$0

Total crane rent and labor cost

$0

Total crane rent and labor cost

$0

Man-hours

1,950 hrs

Man-hours

1,950 hrs

Man-hours

1,950 hrs

For furnace and column

Total crane rent and labor cost

$0

Total crane rent and labor cost

$0

Total crane rent and labor cost

$0

Man-hours

3,000 hrs

Man-hours

3,000 hrs

Man-hours

3,000 hrs

LIFTBOT improves worker safety by reducing manual handling and minimizing crane use by up to 50%

Technical parameters

Technical parameters

Operating speed

138 ft/min (42 m/min)

Performance

8,000 lbs (4 tons) on average with 3 people on an 8 hour shift

Maximum wind speed

45 mph (72 km/h)

Setup time

10 minutes, performed directly by workers

Setup requirements

No access bay, no changes to scaffold design, no additional anchors

Working height

Certified up to 165 ft (50 m), but easily extendable

Control

Automatic, no need to keep a finger on the button

Battery

10 hours of use, 3 hours of charge, charges on a regular wall outlet (110V or 230V)

Certification

CE, UL, and CSA

Interchangeable transport platforms

Optimized tools for Scaffold and general materials

Operating speed

138 ft/min (42 m/min)

Performance

8,000 lbs (4 tons) on average with 3 people on an 8 hour shift

Maximum wind speed

45 mph (72 km/h)

Setup time

10 minutes, performed directly by workers

Setup requirements

No access bay, no changes to scaffold design, no additional anchors

Working height

Certified up to 165 ft (50 m), but easily extendable

Control

Automatic, no need to keep a finger on the button

Battery

10 hours of use, 3 hours of charge, charges on a regular wall outlet (110V or 230V)

Certification

CE, UL, and CSA

Interchangeable transport platforms

Optimized tools for Scaffold and general materials

Operating speed

138 ft/min (42 m/min)

Performance

8,000 lbs (4 tons) on average with 3 people on an 8 hour shift

Maximum wind speed

45 mph (72 km/h)

Setup time

10 minutes, performed directly by workers

Setup requirements

No access bay, no changes to scaffold design, no additional anchors

Working height

Certified up to 165 ft (50 m), but easily extendable

Control

Automatic, no need to keep a finger on the button

Battery

10 hours of use, 3 hours of charge, charges on a regular wall outlet (110V or 230V)

Certification

CE, UL, and CSA

Interchangeable transport platforms

Optimized tools for Scaffold and general materials

More case studies

Add LIFTBOT to your project

Add LIFTBOT to your project

Simon Espinosa

Business Development Manager